Tarmac Compaction Calculator
Loose material behind the paver occupies about 20% more volume than the finished surface. Convert between loose and compacted thickness by mix type.
Tarmac Compaction Calculator
Loose material behind the paver occupies about 20% more volume than the finished surface. Convert between loose and compacted thickness by mix type.
Density by mix type
| Designation | Description | Density (kg/m³) | Typical use | Standard |
|---|---|---|---|---|
| AC 10 surf | Asphalt concrete surface course, 10 mm | 2,340 | Surface course 25–40 mm | BS EN 13108-1 |
| AC 14 surf | Asphalt concrete surface course, 14 mm | 2,350 | Surface course 40–50 mm | BS EN 13108-1 |
| HRA 30/14 | Hot rolled asphalt with pre-coated chippings | 2,290 | Traditional surface course | BS EN 13108-4 |
| SMA 10 surf | Stone mastic asphalt | 2,400 | High-traffic surface course | BS EN 13108-5 |
| Thin surface course system | Proprietary thin surfacing | 2,320 | Surface course 20–40 mm | BS EN 13108-2 |
| AC 20 bin | Asphalt concrete binder course, 20 mm | 2,360 | Binder course 50–80 mm | BS EN 13108-1 |
| AC 32 base | Asphalt concrete base, 32 mm | 2,370 | Base 80–150 mm | BS EN 13108-1 |
| EME2 | High-modulus base | 2,435 | Heavy-duty base | BS EN 13108-1 / CD 226 |
| Porous asphalt | PA 20 | 2,000 | Drainage surface course | BS EN 13108-7 |
| Recycled planings | Reclaimed asphalt planings | 2,000 | Drives, hardstanding, sub-base | BS EN 13108-8 |
| Type 1 sub-base | Granular sub-base | 2,100 | Unbound sub-base 100–300 mm | SHW Clause 803 |
| Bitumen 40/60 | Paving grade binder | 1,030 | Tack coat and binder only | BS EN 12591 |
The formula
m³ = m² × m
kg = m³ × 2,350
Waste and compaction allowance
Loose material behind the paver occupies roughly 20% more volume than the finished compacted surface. Add edge trimming, material left in the vehicle body and normal measurement tolerance, and you need an allowance on top of the calculated tonnage.
| Situation | Allowance | Reason |
|---|---|---|
| Simple rectangle, machine-laid, experienced crew | 5% | Minimal trimming and predictable compaction |
| Standard driveway or car park | 10% | Normal edge detail and some hand work at the perimeter |
| Curved edges or several separate zones | 15% | More offcuts and more hand placement |
| Hand-laid work and small patches | 15% | Hand compaction is less consistent |
| Recycled planings | 15–20% | Higher compaction factor and less predictable spread |
| Unbound granular base | 20–25% | Significant consolidation under the roller |
Round the final figure up to the nearest half tonne. Being short means a cold joint in the middle of the surface and a second delivery charge, which costs far more than the extra material would have.
The base underneath
The unbound layer under the surfacing does more structural work than the surfacing itself, and it is where most premature failures actually originate. A thinner bound layer over a deep, well-compacted, free-draining base will outlast a thicker bound layer over a shallow one.
| Subgrade | Approximate CBR | Base under domestic access | Base under commercial |
|---|---|---|---|
| Well-graded gravel | 20–40 | 100 mm | 150 mm |
| Sand, well drained | 10–20 | 100–150 mm | 150–200 mm |
| Silty sand | 6–10 | 150 mm | 200 mm |
| Loam | 5–8 | 150–200 mm | 200–250 mm |
| Silty clay | 3–5 | 200–250 mm | 250–300 mm |
| Heavy clay, poorly drained | 2–3 | 250–300 mm plus geotextile | 300–450 mm plus stabilisation |
| Peat or organic soil | under 2 | Excavate and replace | Excavate and replace |
Two additions repay their cost on marginal ground: a separation geotextile between the subgrade and the granular layer, which stops stone punching down into soft clay and can save 50–100 mm of aggregate; and proof-rolling with a loaded vehicle before any stone is placed, which finds the soft spots while they are still cheap to deal with.
Remember that the granular base is usually the larger tonnage of the two. A 100 m² area with 200 mm of base at 2,100 kg/m³ needs 42 tonnes of stone against roughly 12 tonnes of surfacing at 50 mm. Budget and order for both.
Ordering and delivery
What the plant needs from you
- Tonnage including your allowance, rounded up to the nearest half tonne.
- The mix designation — the plant's own name for it or the specification clause. "Tarmac" on its own is not an order.
- Delivery date and a time window the crew can actually meet. Hot mix cannot wait for a late start.
- Site access — gate width, turning radius, overhead cables, ground bearing capacity and any weight restriction on the approach.
- Discharge method — directly into the paver, into a transfer vehicle, or tipped for hand-laying.
- Whether tack coat and prime coat are included or supplied separately.
- The minimum order and small-load surcharge. Ask before you finalise the quantity — it may change how you sequence the work.
Delivery vehicles
| Vehicle | Typical payload | Best suited to |
|---|---|---|
| Rigid tipper (4-wheel) | 6–8 t | Very tight access, small domestic work |
| Rigid tipper (6-wheel) | 10–14 t | Domestic drives, restricted sites |
| Rigid tipper (8-wheel) | 16–20 t | The usual default for driveways and small car parks |
| Artic tipper | 26–29 t | Larger car parks and road work with good access |
| Insulated / thermal body | as above | Longer hauls, cold weather, thin surfacing |
| Material transfer vehicle | 25 t+ | Continuous paving, eliminates segregation |
A part-load at the end of a job is common. It is often worth increasing the design thickness slightly to fill the last vehicle rather than paying a small-load surcharge on two or three tonnes.
Standards and who administers them
Surfacing work in the United Kingdom is specified under BS EN 13108 and BS 594987, administered by National Highways and the Specification for Highway Works. In practice that governs three things you will see on any quotation or drawing:
- The mix designation. Each layer has a defined material with a stated aggregate size, binder grade and target void content. This is what determines the density used in your tonnage calculation.
- The layer thicknesses. Minimum and maximum lift thicknesses are tied to the nominal aggregate size, because a lift thinner than about twice the largest stone cannot be compacted and one thicker than about three times it cannot be compacted through.
- Compaction acceptance. Density is normally specified as a percentage of the laboratory maximum rather than an absolute figure, because the maximum varies with the mix design.
For private domestic work none of this is legally binding, but the same physics applies. Asking a contractor which specification they are working to, and getting the compacted thickness written into the quotation in millimetres, is the single most useful thing you can do to make competing quotations comparable.
Diagnosing surface problems
| What you see | Where it originates | What to do |
|---|---|---|
| Loose aggregate on the surface (ravelling) | Wearing course — oxidised binder | Surface dressing or a thin overlay |
| Longitudinal depressions in the wheel path (rutting) | Wearing or binder course | Plane off and replace with a stiffer mix |
| Interconnected polygonal cracking | Structural — base or subgrade | Reconstruction; an overlay will reflect through within two years |
| Straight cracks along the paving line | Construction joint | Seal, then overlay |
| Regular cracks across the carriageway | Binder grade against climate | Seal; specify a softer low-temperature binder next time |
| Localised low spots and ponding | Subgrade settlement | Excavate, rebuild the formation and repave that area |
| Crumbling edges | Unsupported edge | Backfill against the edge or install an edge restraint |
| Potholes | Water plus existing cracking | Full-depth patch, then fix the drainage that caused it |
Frequently asked questions
How many tonnes do I need?
Area in m² × compacted thickness in m × 2.35. A 100 m² area at 50 mm needs about 11.8 tonnes.
How many m² does a tonne cover?
About 8.5 m² at 50 mm compacted.
What allowance should I add?
10% for standard work, 5% for simple machine-laid rectangles, 15% for curved or hand-laid areas.
Does the calculator handle several areas?
Yes — add a zone per shape, each with its own thickness and mix type. Multi-layer structures and irregular sites are entered directly.
Which standards apply?
BS EN 13108 and BS 594987, administered by National Highways and the Specification for Highway Works.
Sources and further reading
- Mineral Products Association — Asphalt
- National Highways (UK)
- BSI — BS 594987
- EAPA — European Asphalt Pavement Association