Asphalt Calculator Pakistan — Tonnage, Volume and Cost in ₨

Free asphalt and bitumen calculator for Pakistan. Tonnage, volume and ₨ cost to NHA General Specifications, with 60/70 and 80/100 binder guidance.

Project dimensions

Full cost breakdown
Use this often? Press Ctrl+D (or ⌘+D on Mac) to bookmark this calculator so it's one tap away next time.

Calculator

Enter the dimensions of the area you are surfacing and this calculator returns the area, the volume in cubic metres, the weight, the tonnage to order and an estimated cost in PKR. It is set up for Pakistan: metric units by default, the mix designations used under NHA General Specifications and AASHTO material standards, and local pricing.

Quick answers

A 1,000 m² road at 50 mm of asphaltic concrete wearing course needs about 117 tons, or 129 tons with a 10% allowance.

Area40 mm50 mm60 mm80 mm100 mm
25 m²2.3 t2.9 t3.5 t4.7 t5.8 t
50 m²4.7 t5.8 t7.0 t9.4 t11.7 t
100 m²9.4 t11.7 t14.0 t18.7 t23.4 t
200 m²18.7 t23.4 t28.1 t37.4 t46.8 t
500 m²46.8 t58.5 t70.2 t93.6 t117.0 t
1,000 m²93.6 t117.0 t140.4 t187.2 t234.0 t
5,000 m²468.0 t585.0 t702.0 t936.0 t1,170.0 t
7,300 m²683.3 t854.1 t1,024.9 t1,366.6 t1,708.2 t

The tonnage formula

Volume (m³) = Area (m²) × Compacted thickness (m)
Weight (kg) = Volume (m³) × Density (kg/m³)
Tonnes = Weight (kg) ÷ 1,000
Combined: Tonnes = Area (m²) × Thickness (m) × 2.34

Worked example — a 240 m² area at 50 mm compacted:

Density by mix type

Pakistani asphaltic concrete follows NHA General Specifications with penetration-grade binder — 60/70 in most of the country and 80/100 in the colder north. Wearing course density is 2,300–2,370 kg/m³.

DesignationDescriptionDensity (kg/m³)Typical useStandard
Asphaltic Concrete Wearing CourseClass A / Class B2,34040–50 mm wearing courseNHA GS Item 305
Asphaltic Base CourseABC2,36050–100 mm baseNHA GS Item 306
Asphalt Treated BaseATB2,350Heavy-duty baseNHA GS
Bituminous MacadamOpen-graded base2,180Profile correctionNHA GS
Triple Surface TreatmentTST / chip sealSurface dressingNHA GS Item 303
SMAStone Matrix Asphalt2,400Heavy traffic corridorsAASHTO M 325
Recycled asphalt (RAP)Milled material2,000Base, shoulders, access tracksAASHTO M 323
Aggregate Base CourseGranular base2,200150–300 mmNHA GS Item 304
Sub-baseGranular sub-base2,150150–300 mmNHA GS
Bitumen 60/70Penetration grade binder1,030Binder and tack coatAASHTO M 20
Bitumen 80/100Penetration grade, cold regions1,025Northern areasAASHTO M 20
Emulsion, tack coatCationic emulsion1,010Between liftsNHA GS Item 302
Asphalt density by mix typeHorizontal bar chart of compacted asphalt density by mix type, ranging from porous asphalt at 100 pounds per cubic foot to EME 2 at 152 pounds per cubic foot, with dense-graded hot mix asphalt at 145.Compacted asphalt density by mix typePorous / Permeable Asphalt100 lb/ft³ · 1,602 kg/m³Open-Graded Friction Course115 lb/ft³ · 1,842 kg/m³RAP Millings125 lb/ft³ · 2,002 kg/m³Bituminous Macadam135 lb/ft³ · 2,162 kg/m³Cold Mix Asphalt140 lb/ft³ · 2,243 kg/m³Warm Mix Asphalt143 lb/ft³ · 2,291 kg/m³Dense-graded HMA145 lb/ft³ · 2,323 kg/m³Bituminous Concrete147 lb/ft³ · 2,355 kg/m³Dense Bituminous Macadam148 lb/ft³ · 2,371 kg/m³BBSG 0/10148 lb/ft³ · 2,371 kg/m³Grave Bitume149 lb/ft³ · 2,387 kg/m³Stone Matrix Asphalt150 lb/ft³ · 2,403 kg/m³BBME150 lb/ft³ · 2,403 kg/m³EME 2152 lb/ft³ · 2,435 kg/m³AsphaltCalculatorPrice.com — values are nominal compacted in-place densities.
Compacted asphalt density by mix type, from porous asphalt at 100 lb/ft³ to EME 2 at 152 lb/ft³.

Coverage per tonne

Compacted thicknessm² per tonnetonnes per 100 m²tonnes per 1,000 m²
20 mm21.44.6846.8
25 mm17.15.8558.5
30 mm14.27.0270.2
40 mm10.79.3693.6
50 mm8.511.70117.0
60 mm7.114.04140.4
70 mm6.116.38163.8
80 mm5.318.72187.2
100 mm4.323.40234.0
150 mm2.835.10351.0
200 mm2.146.80468.0

Recommended thickness

ApplicationSurface courseBinder / base courseUnbound base
Village access roadTST surface dressing150 mm ABC
Residential street40 mm AC wearing50 mm ABC200 mm aggregate base
Urban road50 mm AC wearing75 mm ABC250 mm aggregate base
Provincial highway50 mm AC wearing100 mm ABC250 mm base + 200 mm sub-base
National highway50 mm AC wearing125–175 mm ABC300 mm base + 250 mm sub-base
Motorway50 mm SMA or AC175–225 mm ABC300 mm base + 300 mm sub-base
Industrial yard50 mm AC100 mm ABC300 mm base
Parking area40 mm AC50 mm ABC200 mm base
Asphalt road cross-sectionFive stacked pavement layers from the wearing course at the top through binder course, base course, unbound sub-base and the compacted subgrade, each labelled with its typical thickness.Asphalt road cross-sectionWearing course40–50 mmBinder course50–80 mmBase course80–150 mmSub-base (aggregate)100–300 mmSubgrade (soil)compactedAsphaltCalculatorPrice.com
Asphalt road cross-section — Wearing course, Binder course, Base course, Sub-base (aggregate), Subgrade (soil).

2026 prices

ItemLowTypicalHigh
Asphaltic Concrete Wearing Course per ton₨25,000₨27,500₨32,000
Asphaltic Base Course per ton₨22,500₨25,000₨29,000
Bituminous Macadam per ton₨19,500₨22,000₨26,000
SMA per ton₨32,000₨36,000₨42,000
RAP / recycled per ton₨3,000₨5,500₨9,000
Aggregate Base Course per ton₨3,200₨4,200₨5,600
Bitumen 60/70 per ton₨185,000₨210,000₨235,000
Bitumen 80/100 per ton₨188,000₨214,000₨240,000
Road surfacing per m² (AC 50 mm)₨1,450₨1,850₨2,400
Full flexible pavement per m²₨4,200₨5,800₨8,200

Price by region

RegionMaterialInstalled
Punjab (Lahore, Faisalabad)₨25,000 – ₨30,000 / ton₨1,500 – ₨2,200 / m²
Sindh (Karachi, Hyderabad)₨26,000 – ₨32,000 / ton₨1,600 – ₨2,400 / m²
Islamabad & Rawalpindi₨26,000 – ₨31,000 / ton₨1,550 – ₨2,300 / m²
Khyber Pakhtunkhwa₨26,500 – ₨32,500 / ton₨1,600 – ₨2,450 / m²
Balochistan₨29,000 – ₨38,000 / ton₨1,800 – ₨2,900 / m²
Gilgit-Baltistan₨32,000 – ₨42,000 / ton₨2,000 – ₨3,200 / m²
Azad Jammu & Kashmir₨29,000 – ₨37,000 / ton₨1,800 – ₨2,800 / m²

Waste and compaction allowance

Loose versus compacted asphalt thicknessTwo stacked bars showing that a 3 inch loose asphalt mat compacts down to roughly 2.5 inches, a reduction of about 20 percent.Loose mat versus compacted thickness3.0 in looseBehind the paver, before rolling2.5 in compactedAfter 6–8 roller passesCompaction factor for dense-graded HMA ≈ 1.20 — a 20% volume reduction.Always order against the compacted thickness, never the loose one.AsphaltCalculatorPrice.com
A 3 in loose asphalt mat compacts to roughly 2.5 in. Order against the compacted thickness.

Loose material behind the paver occupies about 20% more volume than the compacted surface. Add edge trimming, material left in the lorry and normal measurement tolerance, and a 10% allowance is standard.

Common mistakes

  1. Using the loose thickness instead of the compacted design thickness.
  2. Failing to convert millimetres to metres before multiplying.
  3. Applying one density to every mix type.
  4. Measuring the excavation rather than the finished surface.
  5. Calculating a multi-layer structure as a single combined thickness.
  6. Forgetting the unbound base, which is often the larger tonnage.
  7. Not checking the plant's minimum order and small-load surcharge.
  8. Rounding down. A short order means a cold joint and a second mobilisation.

Measuring the site

Splitting an irregular area into simple shapesAn L-shaped driveway with a turning circle, divided into two rectangles and one half-circle so each piece can be calculated separately and the areas added together.Split an irregular site into rectangles, circles and trianglesABCA — rectanglelength × widthB — rectanglelength × widthC — half circleπ × r² ÷ 2Total = A + B + CThe calculator on this page adds unlimited areas — one per shape. AsphaltCalculatorPrice.com
An irregular driveway split into two rectangles and a half-circle. Calculate each piece, then add the tonnages.

Split the site into rectangles, triangles, circles and trapezoids and enter each as a separate area. Measure every dimension at three points and use the largest — surfaced areas are rarely as regular as they look. For a circular turning area, measure the diameter at the widest point and let the calculator apply π × r².

On a slope the true surface area exceeds the plan area. At a 10% gradient the difference is only 0.5% and can be ignored. Above 20%, multiply the length by √(1 + gradient²).

Frequently asked questions

How much asphalt do I need?

Multiply the area in square metres by the compacted thickness in metres, then by 2.34. A 100 m² area at 50 mm needs about 11.7 tonnes, or 12.9 tonnes with a 10% allowance.

What is the density of asphalt?

Pakistani asphaltic concrete follows NHA General Specifications with penetration-grade binder — 60/70 in most of the country and 80/100 in the colder north. Wearing course density is 2,300–2,370 kg/m³. The calculator uses 2,340 kg/m³ by default and lets you select any of the 12 mixes listed on this page.

How much does asphalt cost per tonne?

Around ₨25,000 to ₨32,000 in 2026, with ₨27,500 typical. Distance from the plant is the largest single factor.

How many square metres does a tonne cover?

About 8.5 m² at 50 mm compacted, 10.7 m² at 40 mm and 5.3 m² at 80 mm.

How many cubic metres is one tonne?

0.427 m³ at 2,340 kg/m³. The calculation is 1,000 ÷ density.

How thick should the surfacing be?

See the thickness table on this page. Domestic access typically takes a 40 mm AC wearing over 200 mm aggregate base; commercial and adopted work is considerably heavier and follows NHA General Specifications and AASHTO material standards.

What allowance should I add?

10% for standard work, 5% for a simple machine-laid rectangle, 15% for curved or hand-laid areas and 15–20% for recycled material.

Which standards apply?

Work in Pakistan follows NHA General Specifications and AASHTO material standards, administered by the National Highway Authority (NHA) and provincial highway departments.

Sources and further reading

Last reviewed: Next review: November 2026 Reviewed by: AsphaltCalculatorPrice Editorial TeamRegion: Pakistan