Area Converter

Type into any field and the others update instantly.

Project dimensions

Use this often? Press Ctrl+D (or ⌘+D on Mac) to bookmark this calculator so it's one tap away next time.

Type into any field and the others update instantly.

Density by mix type

DesignationDescriptionDensity (kg/m³)Typical useStandard
BC — Bituminous ConcreteWearing course2,35530–50 mm wearing courseMoRTH Clause 509
SDBC — Semi-Dense Bituminous ConcreteThin wearing course2,33025–30 mmMoRTH Clause 508
DBM — Dense Bituminous MacadamBinder / base course2,37050–100 mmMoRTH Clause 507
BM — Bituminous MacadamOpen-graded base2,16050–75 mm profile courseMoRTH Clause 504
Premix carpetThin open-graded surfacing2,00020 mm rural surfacingMoRTH Clause 511
Mix seal surfacingThin surfacing with seal2,05020 mmMoRTH Clause 512
SMAStone Matrix Asphalt2,400High-traffic wearing courseIRC SP:79
BC with modified binderPMB wearing course2,365Heavy traffic corridorsIRC SP:53
RAP / recycled mixReclaimed bituminous material2,000Base and shouldersIRC 120
WMM — Wet Mix MacadamGranular base2,200150–250 mm baseMoRTH Clause 406
GSB — Granular Sub-BaseUnbound sub-base2,150150–300 mmMoRTH Clause 401
VG-30 bitumenViscosity grade binder1,030Binder and tack coat onlyIS 73

Coverage per tonne

Compacted thicknessm² per tonnetonnes per 100 m²tonnes per 1,000 m²
20 mm21.24.7147.1
25 mm17.05.8958.9
30 mm14.27.0670.6
40 mm10.69.4294.2
50 mm8.511.78117.8
60 mm7.114.13141.3
70 mm6.116.49164.9
80 mm5.318.84188.4
100 mm4.223.55235.5
150 mm2.835.33353.2
200 mm2.147.10471.0

Calculator

Waste and compaction allowance

Loose material behind the paver occupies roughly 20% more volume than the finished compacted surface. Add edge trimming, material left in the vehicle body and normal measurement tolerance, and you need an allowance on top of the calculated tonnage.

SituationAllowanceReason
Simple rectangle, machine-laid, experienced crew5%Minimal trimming and predictable compaction
Standard driveway or car park10%Normal edge detail and some hand work at the perimeter
Curved edges or several separate zones15%More offcuts and more hand placement
Hand-laid work and small patches15%Hand compaction is less consistent
Recycled planings15–20%Higher compaction factor and less predictable spread
Unbound granular base20–25%Significant consolidation under the roller

Round the final figure up to the nearest half tonne. Being short means a cold joint in the middle of the surface and a second delivery charge, which costs far more than the extra material would have.

Standards and who administers them

Surfacing work in India is specified under MoRTH Specifications for Road and Bridge Works and IRC codes, administered by MoRTH, NHAI and the Indian Roads Congress. In practice that governs three things you will see on any quotation or drawing:

For private domestic work none of this is legally binding, but the same physics applies. Asking a contractor which specification they are working to, and getting the compacted thickness written into the quotation in millimetres, is the single most useful thing you can do to make competing quotations comparable.

Last reviewed: Next review: November 2026 Reviewed by: AsphaltCalculatorPrice Editorial Team