Bitumen Price Chart

2026 pricing across every region of India, by mix type, with the binder index behind it.

Project dimensions

Full cost breakdown
Use this often? Press Ctrl+D (or ⌘+D on Mac) to bookmark this calculator so it's one tap away next time.
2026 asphalt price per ton by US regionBar chart of hot mix asphalt material price per ton across ten US regions in 2026. The solid bar shows the low end of the range and the faded bar the high end, from about 80 dollars in the South to 300 dollars in Alaska and Hawaii.2026 asphalt material price per ton, by US region$0$50$100$150$200$250$300$205New England$195Mid-Atl.$160South Atl.$170East N.C.$155West N.C.$150East S.C.$155West S.C.$180Mountain$210Pacific$300AK/HISolid = low end, faded = high end. Source: regional contractor survey + BLS PPI. AsphaltCalculatorPrice.com
2026 asphalt price per ton by US region. New England and the Pacific run roughly 30–40% above the South.

Price by region

RegionMaterialInstalled
Delhi NCR₹6,400 – ₹7,900 / MT₹380 – ₹560 / m²
Maharashtra₹6,300 – ₹7,700 / MT₹370 – ₹540 / m²
Gujarat₹6,100 – ₹7,400 / MT₹350 – ₹510 / m²
Karnataka₹6,200 – ₹7,600 / MT₹360 – ₹530 / m²
Tamil Nadu₹6,200 – ₹7,500 / MT₹360 – ₹520 / m²
Telangana & Andhra Pradesh₹6,100 – ₹7,400 / MT₹350 – ₹510 / m²
Uttar Pradesh₹6,000 – ₹7,300 / MT₹340 – ₹500 / m²
West Bengal₹6,200 – ₹7,600 / MT₹360 – ₹530 / m²
Rajasthan₹6,000 – ₹7,200 / MT₹340 – ₹495 / m²
Kerala₹6,400 – ₹7,800 / MT₹380 – ₹550 / m²
North East states₹7,200 – ₹9,000 / MT₹430 – ₹640 / m²
Himachal & Uttarakhand₹6,900 – ₹8,600 / MT₹410 – ₹610 / m²

2026 prices

ItemLowTypicalHigh
Bituminous Concrete (BC) per MT₹6,200₹6,800₹7,900
DBM per MT₹5,600₹6,200₹7,200
BM per MT₹4,900₹5,500₹6,400
Premix carpet per MT₹4,600₹5,200₹6,100
SMA per MT₹7,600₹8,500₹9,800
RAP / recycled per MT₹700₹1,400₹2,400
WMM per MT₹950₹1,250₹1,650
VG-30 bitumen per MT₹48,000₹52,000₹58,000
Road surfacing per m² (BC 40 mm)₹320₹420₹560
Full flexible pavement per m²₹1,100₹1,650₹2,400
2026 liquid bitumen price by monthLine chart of liquid asphalt binder price per ton through 2026, rising from about 585 dollars in January to a peak near 674 dollars in July before easing back to about 616 dollars in December.2026 liquid bitumen (asphalt binder) price per tonJanFebMarAprMayJunJulAugSepOctNovDec$674$585Binder price peaks with the northern paving season. Source: BLS PPI series for asphalt paving mixtures. AsphaltCalculatorPrice.com
2026 liquid bitumen price per ton by month. The summer peak tracks northern-hemisphere paving demand.

What moves the price

FactorEffect on priceWhy
Distance from the plantVery highHot mix must arrive above 130 °C, which limits a plant to roughly an hour's haul. Sites with two or three plants in range pay noticeably less than sites served by one.
Bitumen binder costHighBinder is 4.5–6% of the mix by weight but 25–35% of its cost, and it tracks crude oil with a lag of two to four months.
SeasonMedium-highPlants concentrate output into the paving season. Prices peak in mid-summer and soften at each end of the season.
Order sizeMediumBelow about 5 tonnes a small-load surcharge usually applies. Above a few hundred tonnes the rate becomes negotiable.
Mix specificationMediumPolymer-modified and stone mastic mixes cost 25–50% more per tonne than standard dense-graded material.
Aggregate supplyMediumRegions that import aggregate carry that cost straight into the mix price.
Access and site constraintsMediumNarrow access, weight-restricted bridges or overhead cables force smaller vehicles and raise the delivered rate.
Recycled contentLow-mediumHigher permitted recycled content lowers the plant's raw material cost.

Ordering and delivery

What the plant needs from you

Delivery vehicles

VehicleTypical payloadBest suited to
Rigid tipper (4-wheel)6–8 tVery tight access, small domestic work
Rigid tipper (6-wheel)10–14 tDomestic drives, restricted sites
Rigid tipper (8-wheel)16–20 tThe usual default for driveways and small car parks
Artic tipper26–29 tLarger car parks and road work with good access
Insulated / thermal bodyas aboveLonger hauls, cold weather, thin surfacing
Material transfer vehicle25 t+Continuous paving, eliminates segregation

A part-load at the end of a job is common. It is often worth increasing the design thickness slightly to fill the last vehicle rather than paying a small-load surcharge on two or three tonnes.

Waste and compaction allowance

Loose material behind the paver occupies roughly 20% more volume than the finished compacted surface. Add edge trimming, material left in the vehicle body and normal measurement tolerance, and you need an allowance on top of the calculated tonnage.

SituationAllowanceReason
Simple rectangle, machine-laid, experienced crew5%Minimal trimming and predictable compaction
Standard driveway or car park10%Normal edge detail and some hand work at the perimeter
Curved edges or several separate zones15%More offcuts and more hand placement
Hand-laid work and small patches15%Hand compaction is less consistent
Recycled planings15–20%Higher compaction factor and less predictable spread
Unbound granular base20–25%Significant consolidation under the roller

Round the final figure up to the nearest half tonne. Being short means a cold joint in the middle of the surface and a second delivery charge, which costs far more than the extra material would have.

Maintenance schedule

IntervalActionWhy it matters
Within the first 48 hoursKeep all vehicles offThe mat is still cooling and takes a permanent impression easily.
First 30 daysAvoid turning the wheel while stationary; support trailer jacks on a boardThe binder has not fully hardened and point loads leave marks.
Within 6–12 monthsFirst surface dressing or seal, if specifiedSlows oxidation of the binder. Applying it sooner traps volatiles and softens the surface.
AnnuallySweep, clear drainage, inspect edges and jointsStanding water at an edge is the most common cause of premature failure.
Every 1–2 yearsSeal any cracks that have appearedA sealed crack costs a fraction of the pothole it becomes.
Every 3–5 yearsReseal and, on car parks, re-lineRestores surface texture and appearance.
Every 10–15 yearsConsider a surface course overlayResets the wearing layer while the structure below survives.
20–25 yearsFull reconstructionOnly when the structure itself has failed, not merely the surface.

Deferred maintenance compounds quickly. A crack sealed early costs very little; the same crack left for two winters admits water, softens the base and becomes a full-depth patch. The economics of surfacing maintenance are almost entirely about intervening before water reaches the layers below.

The base underneath

The unbound layer under the surfacing does more structural work than the surfacing itself, and it is where most premature failures actually originate. A thinner bound layer over a deep, well-compacted, free-draining base will outlast a thicker bound layer over a shallow one.

SubgradeApproximate CBRBase under domestic accessBase under commercial
Well-graded gravel20–40100 mm150 mm
Sand, well drained10–20100–150 mm150–200 mm
Silty sand6–10150 mm200 mm
Loam5–8150–200 mm200–250 mm
Silty clay3–5200–250 mm250–300 mm
Heavy clay, poorly drained2–3250–300 mm plus geotextile300–450 mm plus stabilisation
Peat or organic soilunder 2Excavate and replaceExcavate and replace

Two additions repay their cost on marginal ground: a separation geotextile between the subgrade and the granular layer, which stops stone punching down into soft clay and can save 50–100 mm of aggregate; and proof-rolling with a loaded vehicle before any stone is placed, which finds the soft spots while they are still cheap to deal with.

Remember that the granular base is usually the larger tonnage of the two. A 100 m² area with 200 mm of base at 2,100 kg/m³ needs 42 tonnes of stone against roughly 12 tonnes of surfacing at 50 mm. Budget and order for both.

Calculator

Frequently asked questions

How many tonnes do I need?

Area in m² × compacted thickness in m × 2.35. A 100 m² area at 50 mm needs about 11.8 tonnes.

How many m² does a tonne cover?

About 8.5 m² at 50 mm compacted.

What allowance should I add?

10% for standard work, 5% for simple machine-laid rectangles, 15% for curved or hand-laid areas.

Does the calculator handle several areas?

Yes — add a zone per shape, each with its own thickness and mix type. Multi-layer structures and irregular sites are entered directly.

Which standards apply?

MoRTH Specifications for Road and Bridge Works and IRC codes, administered by MoRTH, NHAI and the Indian Roads Congress.

Sources and further reading

2026 Q3

Last reviewed: Next review: November 2026 Reviewed by: AsphaltCalculatorPrice Editorial TeamRegion: India