Coverage Converter

Type into any field and the others update instantly.

Project dimensions

Use this often? Press Ctrl+D (or ⌘+D on Mac) to bookmark this calculator so it's one tap away next time.

Type into any field and the others update instantly.

Density by mix type

DesignationDescriptionDensity (kg/m³)Typical useStandard
Asphaltic Concrete Wearing CourseClass A / Class B2,34040–50 mm wearing courseNHA GS Item 305
Asphaltic Base CourseABC2,36050–100 mm baseNHA GS Item 306
Asphalt Treated BaseATB2,350Heavy-duty baseNHA GS
Bituminous MacadamOpen-graded base2,180Profile correctionNHA GS
Triple Surface TreatmentTST / chip sealSurface dressingNHA GS Item 303
SMAStone Matrix Asphalt2,400Heavy traffic corridorsAASHTO M 325
Recycled asphalt (RAP)Milled material2,000Base, shoulders, access tracksAASHTO M 323
Aggregate Base CourseGranular base2,200150–300 mmNHA GS Item 304
Sub-baseGranular sub-base2,150150–300 mmNHA GS
Bitumen 60/70Penetration grade binder1,030Binder and tack coatAASHTO M 20
Bitumen 80/100Penetration grade, cold regions1,025Northern areasAASHTO M 20
Emulsion, tack coatCationic emulsion1,010Between liftsNHA GS Item 302

Coverage per tonne

Compacted thicknessm² per tonnetonnes per 100 m²tonnes per 1,000 m²
20 mm21.44.6846.8
25 mm17.15.8558.5
30 mm14.27.0270.2
40 mm10.79.3693.6
50 mm8.511.70117.0
60 mm7.114.04140.4
70 mm6.116.38163.8
80 mm5.318.72187.2
100 mm4.323.40234.0
150 mm2.835.10351.0
200 mm2.146.80468.0

Calculator

Waste and compaction allowance

Loose material behind the paver occupies roughly 20% more volume than the finished compacted surface. Add edge trimming, material left in the vehicle body and normal measurement tolerance, and you need an allowance on top of the calculated tonnage.

SituationAllowanceReason
Simple rectangle, machine-laid, experienced crew5%Minimal trimming and predictable compaction
Standard driveway or car park10%Normal edge detail and some hand work at the perimeter
Curved edges or several separate zones15%More offcuts and more hand placement
Hand-laid work and small patches15%Hand compaction is less consistent
Recycled planings15–20%Higher compaction factor and less predictable spread
Unbound granular base20–25%Significant consolidation under the roller

Round the final figure up to the nearest half tonne. Being short means a cold joint in the middle of the surface and a second delivery charge, which costs far more than the extra material would have.

Standards and who administers them

Surfacing work in Pakistan is specified under NHA General Specifications and AASHTO material standards, administered by the National Highway Authority (NHA) and provincial highway departments. In practice that governs three things you will see on any quotation or drawing:

For private domestic work none of this is legally binding, but the same physics applies. Asking a contractor which specification they are working to, and getting the compacted thickness written into the quotation in millimetres, is the single most useful thing you can do to make competing quotations comparable.

Last reviewed: Next review: November 2026 Reviewed by: AsphaltCalculatorPrice Editorial Team